repaving4repaving5Tim has finished the base for the first retaining wall – foreground left image. He said that by the end of the day, he will have a second one done and half of the large wall that separates the patio from the upper section of the backyard.

They actually did the three main retaining walls. The image on the right is the base of the longest wall. All that’s left is the small wall that is the step to the top platform.

The goal is to have the majority of the work done by Friday.

new walls – repaving4