repaving6repaving8

almost finished – repaving5

The slag has been laid and packed, the retaining walls have been built and leveled. Today comes the sand and the pavers.

The images were shot early in the morning. The one on the left has the soft glow of the outdoor flood lights. For the one on the left, I turned the lights off.

One of the renters on Sampsonia has been particularly difficult. He’s moved the orange cones forcing the guys to constantly move the truck; he’s complained about the dust; he’s complained about the noise. Who is this fool? If he wants no interaction with workers, if he wants to not be inconvenienced by the density of urban living he should move to the suburbs.

They are currently laying down the sand-base for the upper section. The goal is to finish tomorrow.